Why Bid
The lead is in one place. The number is in another. The proposal gets typed last.
THE PROBLEM
Invitations in an inbox, a plan room login, and a list somebody keeps on their own machine. Nobody can say what you are actually chasing this month.
A spreadsheet somebody built years ago, that one person understands, that breaks quietly when a rate changes.
The proposal gets typed. The number gets read off one screen and keyed into another. That is the version the customer sees.
You priced every piece of it to win the job. None of that survives the handoff. Somebody builds the bill of material again from scratch.
Every seam between those four is a person re-entering something the business already knew. The re-entry is where the errors live, and the errors are in the number you signed.
WHERE YOU ARE
a lead in an inbox
a number in a spreadsheet
a proposal typed by whoever is still in the office
nothing carrying forward
one list of what you are chasing
the estimate built on your rates
a proposal that comes off that estimate
a BOM out the other end
ON A REAL WEEK
The number was finished at four. The document got built at five, by whoever was still there, from the last thing they were sent — which is not always the last thing that changed. It goes out because the clock says it has to. The check that would have caught it is the step there was no room for.
Precon is tracking what the company intends to chase. Estimating is working whatever landed in the inbox this week. The two lists overlap and nobody can say by how much. Somebody finds out at the wrong moment that a job everyone assumed was covered has no owner on it.
You priced every piece of it to win. What crosses to the shop is a contract value and a set of drawings. The quantities that produced the number are sitting in a file somebody would have to go and find, so the floor takes the job off again from scratch. The company pays for that count twice and only ever counts it once.
ONE INSTANCE
From the job you chase to the piece that ships. One instance.
Job sourcing
Estimate
Proposal
BOM
Nothing gets re-typed if it lives in one instance.
WHY IT STAYED THIS WAY
Fabrication got real systems. Production got tracked, scheduled, documented. The money that went into this trade went into the part you could see on a floor.
The front of the house — deciding what to chase, what it costs, and what to send — was left to whatever the estimator could assemble on their own. It works because your people are good, not because the system is.
That is the hole Bid fills. Not another tool beside the other three. The room where all four steps live.
WHAT CHANGES
Sourcing feeds the estimate. The estimate produces the proposal and the BOM. One chain, one instance.
The rates and assemblies live in the system, not in one person's spreadsheet. It survives them taking a week off.
A dedicated instance, white-labeled as yours. Your format, your rates, your assemblies.
The work you did to win the job becomes the list you build from. It does not get thrown away at handoff.
THE FIRST CALL
No feature tour before we have heard how you chase work.
No price before we understand the bid.
No second brand on the login screen.
Start with an evaluation of your operation.
Evaluate my operationNOT THE ROOM YOU NEED?