Coming soon

ArciFab Lite is available starting Q4 2026.

ArciFab Shop is live now →

ArciFab Lite — price the work

The drawing is right there.
Make it a bill of material.

Labor, material, takeoff, BOM, proposal — one room built for the estimator, with your rates and your name on it.

Built for
The estimator

WHY

A spreadsheet, or a tool that isn’t MEP.

Those are the two options an estimator actually gets. The spreadsheet works because one person made it work and keeps making it work. The tool was built for somebody else's trade, and every job is spent bending it toward yours.

And neither one builds a bill of material off the PDF. The drawing is sitting right there, and getting a real BOM out of it is still a person, a highlighter, and an afternoon.

Why Lite exists

BEFORE THE ROOM

Where the number actually comes from.

Cutting head working a flat sheet on a slat table

The drawing is on the desk.

The set is right there, printed or on the screen, and every quantity the job needs is already in it. Getting them out is still an afternoon of counting, because a drawing is made to build from and not to price from. So the estimator counts.

Finished spiral duct with elbows

The highlighter is the takeoff.

Colours by system, tick marks down the margin, a running tally on a pad. It is accurate as long as the person doing it is careful, and it is invisible to everybody else. Nothing about it can be checked afterwards, and none of it carries forward to the floor.

Electrician carrying a coil of flexible conduit on a job site

The field inherits the miss.

Whatever got missed in the count turns up later as a short delivery or a change order. The crew finds it, not the estimator. By then the number is a commitment somebody has to keep, and the difference comes out of the shop or out of the job.

WHAT

Five things, one room.

Each one feeds the next inside the same instance. Nothing gets re-keyed.

Labor

Your rates and your factors, held in the system rather than in one person's tab.

Material

Priced off your assemblies, the way your people already build a number.

Takeoff

Done against the drawing itself, so the count and the drawing never drift apart.

BOM

Off the PDF. A real bill of material, not a number that implies one.

Proposal

Comes off the estimate that produced it, in your format, under your name.

WHAT A WRONG NUMBER COSTS

The estimate is a promise the field has to keep.

Price it low and the shop wins a job it loses money on. Price it high and it does not win. What sits underneath both is whether anyone can see the process the number was built from.

Field labor cost estimated as waste or unproductive time, U.S. construction 11–15%

FMI, cited in ArciFab Insights, “You Don’t Know What You’re Missing.”

Reduction in rework and waste tied to end-to-end digitalization Up to 20%

McKinsey, cited in ArciFab Insights, “You Don’t Know What You’re Missing.”

Typical annual renewal increase on a subscription platform 10–15%

As published in ArciFab Insights, “End the Annual Hostage Negotiation for Your Own Data.”

Bars are drawn on a common 0–25% scale. These are industry patterns, not your shop’s numbers, and nobody should pretend they are — they only help an operation that can see its own process. Figures as published in ArciFab Insights.

HOW

Evaluate the operation, then stand up the room.

The same six steps we run for every room — no different because Lite is the smaller one.

We look first

How you already price work — the rates, the assemblies, the spreadsheet everyone quietly depends on.

A dedicated instance

Your own environment, white-labeled as yours. Not a seat in somebody else's platform.

We keep it running

In-house IT you do not have to train. Your estimator estimates.

Price the work. Let us handle the technology.

Start with an evaluation of your operation.

Evaluate my operation

NOT THE ROOM YOU NEED?