Mains, branch lines and drops cut straight from the sprinkler drawings, cut-and-groove or threaded. Every bundle tagged for its floor and zone, every hydro and inspection record ready for the AHJ. Your own system, with your name on it.
MONDAY MORNING
Branch lines for zone 2 were bundled with zone 3. The crew opened them on the wrong floor and lost the morning sorting pipe.
The head layout moved on Friday. The cut list at the saw did not.
It was in a foreman’s truck. Final inspection waited while somebody drove it back.
We’ve had these Mondays. ARCIFAB is what we made so we’d stop having them.
WHAT IT TRACKS
Mains, branch lines and drops come in as the cut list the saw runs from. Nobody re-types a length.
Every piece carries its end prep, so the groover and the threader know their work before the stick is cut.
Pieces are tagged and bundled for the floor and zone they hang in, so the right bundle goes up the right floor.
Hangers and bracing ship with the bundle they hold, counted against the drawing.
When the drawing revs, the cut list at the saw revs with it, before the next stick is cut.
Hydro results and inspection sign-offs stay with the zone, ready when the fire marshal walks it.
Your logo and your colors on every screen, your statuses and your bundle tags. See the screens your shop runs on →
HOW IT RUNS
01
The sprinkler drawings become the cut list, by floor and zone.
02
Every piece cut and prepped to its drawing, tracked at the saw.
03
Bundles tagged for floor and zone, with their hangers and bracing.
04
Received on site, hung by zone, hydro and inspection logged from a tablet.
YOUR OWN SYSTEM
We walk your floor, set the system up around how you deliver, and put your name on it. You pay once to have it made, then a yearly rate to host it and keep it running, which changes only with data capacity. Add a fitter and the price stays put. Add a trade later and we scope it on its own. Five years on, the system and every job in it are still yours.
Why own your fab shop software90
days to delivery
2
visits to your shop
0
per-seat charges
1
database, yours alone
Let us buy you out of it.
Find out what owning your fab software saves you every year.
QUESTIONS SPRINKLER SHOPS ASK
Yes. Every piece carries its own end prep, and the cut list sorts the work for the groover and the threader.
Yes. Every bundle is tagged for its floor and zone. The field foreman receives the truck against the shipping list and marks each zone hung from a tablet, even with no signal.
With the zone. Hydro results and inspection sign-offs are logged as the work is done, so the package for the AHJ is ready when the system is.
Ninety days, in three 30-day steps, with two visits to your shop. The next 21 months go into making it fit your floor.
NEXT STEP
Bring a sprinkler drawing, a cut list or a bundle tag. We will show you what the system looks like set up around how your shop cuts and bundles.